cookies-policy-banner1 cilantro engineering

THE DUMONT

dumont project building construction mep design systems installations project cilantro engineering mep design contractors
Cilantro Engineering were appointed to work as part of a collaborative team to deliver Design and Build MEP Installations on The Dumont to the highest possible standard. We continue to innovate and develop new and improved systems with our Blue Chip Client James. The Dumont is located on the South Bank of the River Thames. Standing at 30 storeys in height it consists of suites, one, two and three bedroom apartments and penthouses. The development consists of extensive residents’ facilities including games room, ten-pin bowling and private cinema as well as 12th floor residents’ lounge. The building has office space at ground and first floor as well as a restaurant with outside space sitting within the Albert Embankment Plaza. For more information about this project visit the main contractor’s website.

RELATED PROJECTS

CONNECT WITH US